Maintaining the Equipment
4-4
September 2000
Maintaining the Processor
Daily Maintenance
Chemistry Levels
Check that the chemistry in the each of the processor tanks is up to the top of the
overflow pipe.
NOTE: If necessary, add warm water to the processor tanks to bring the fluid level
in the tank to the proper level.
Replenishment and Effluent Chemical Levels
Before each run, check that the replenishment chemicals for the processor are at
a sufficient level to complete the run. Also, check the levels of the effluent (waste)
chemicals in the effluent bottles. If necessary, dispose of the effluent chemicals.
overflow
pipe
chemistry
replenishment
and effluent
chemical bottles
Summary of Contents for PROFESSIONAL LED II 20P
Page 16: ......
Page 20: ......
Page 74: ......
Page 90: ......
Page 118: ......
Page 122: ......
Page 146: ...Additional Calibration Information C 12 September 2000 Value Graph ...
Page 147: ...Additional Calibration Information September 2000 C 13 Difference Graph ...
Page 168: ......
Page 190: ......
Page 197: ......