Maintaining the Equipment
4-6
September 2000
Operational Checks
Check that the crossover assemblies and transport assemblies in the processor
are installed correctly and operating smoothly.
After performing all daily maintenance and before you begin to print jobs, run a
control strip to ensure that the processor is calibrated. See “Processing a Control
Strip” on page 3-32.
Testing
Before running the daily production jobs, run a control strip through the processor
and plot a graph of the results to determine if the equipment is operating properly.
See “Processing a Control Strip” on page 3-32.
If mottle (roller sock images) appears on the prints:
1.
Check the levels of the chemicals in the processor tanks. If necessary, adjust
the levels of the chemistry.
2. Operate the processor drive for 30 minutes to allow the roller socks to
become saturated with chemistry.
Summary of Contents for PROFESSIONAL LED II 20P
Page 16: ......
Page 20: ......
Page 74: ......
Page 90: ......
Page 118: ......
Page 122: ......
Page 146: ...Additional Calibration Information C 12 September 2000 Value Graph ...
Page 147: ...Additional Calibration Information September 2000 C 13 Difference Graph ...
Page 168: ......
Page 190: ......
Page 197: ......