-7-
Note:
Cut tubing straight with a utility knife, make sure there
are no cuts, nicks, flat spots or sharp edge,
If any
of these
are present, cut the tubing again; Do not
kink tubing.
( Fig. 6)
( 6)
Step 2: Making connections
Refer to Figure 4, insert the 3/8" Plastic tubing into the
filter inlet port and the water supply adapter, insert the
1/4" Plastic tubing into the filter outlet port and filtration
faucet; then insert the 1/4" Plastic tubing into the drain
port of RO system and the drain line under the sink.
(Figure 4)
Note:
please refer Fig#5 to install drain plug into drain port of sys
tem.
please don
’
t open water inlet untill filters are installed.
.
Tubing Connectors
Drain Plug
4
3
2
RO
( 4)
Fig.#6
6
Connections to undersink plumbing can be
made with a saddle clamp designed to
accept the drain tubing from the RO
system.
RO
Correct Cut
Incorrect Cut
Fig.#7
7
To attach tubing
Push tubing in as
far as it can go
Tubing must be inserted
past O-ring and hit
backstop
O
Insert the locking clip
1
2
3
Fig.#8
8
To release tubing
Pull outlocking clip
Push in collect to release tubing.
With collect held, pull tubing straight out.
1
2
3
( 7
8)
The Bevel system features reliable and convenient push-to-connect tubing connectors. Tubing is easily connected and
)
8
e
r
u
g
i
F
d
n
a
7
e
r
u
g
i
F
(
.
s
w
o
ll
o
f
s
a
s
g
n
i
t
t
if
e
s
e
h
t
m
o
r
f
d
e
t
c
e
n
n
o
c
s
i
d
Power
Cold
Hot
Outlet 出水
(1/4”Tube 2分PE管)
Drain Pipe 废水管
(1/4”Tube 2分PE管)
Fig.#4
4
Inlet 进水
(3/8”Tube 3分PE管)
Note:
Insert drain plug to 1/4” drain pipe , then
connect 1/4” drain pipe to the drain port of
RO system.(Fig.5)
Fig.#5
5
注意:
1. 请务必在机器废水出口端安装废水塞
2. 管路连接好,请先不要打开进水水源。
等滤芯安装好之后,再打开进水水源。
(不可安装在纯水/龙头出水口端)见下图5。
废水塞
1406034-T01-D
2