7. Begin Tiling the Platform

NOTE:

Allow access to the pump connections.

Install the rough deck material to the platform.

Seal the rough deck or install a waterproof barrier over the rough deck material.

NOTE:

The holes for the faucet, handspray, air switch, and client chair legs should be drilled through the

rough deck and tile prior to the tile being installed.

IMPORTANT!

Leave an opening on the faucet-side of the platform to allow access for installing the faucet

components and air switch. Do not cover this opening until the system has been checked.

Install the side material to the platform.

IMPORTANT!

Faucet should be located as to not interfere with the client chair operation, especially any

that are adjustable front-to-back.

NOTE:

For ease of installation and operation, locate the faucet and air switch controls on the same side of

the platform.

Mark the hole locations for the faucet, handspray, air switch, and K-1011 client chair (if used) legs.

Refer to the above illustration for hole sizes; drill the holes for the faucet, handspray, air switch, and
client chair legs at the marked locations.

Pre-cut or drill the tile as needed to align with the holes drilled in the rough deck.

Install the tile to the platform. Do not cover the access on the faucet-side of the platform at this
time.

IMPORTANT!

Allow the tile adhesive and grout to cure according to the manufacturers’ instructions

before proceeding.

Air Switch Location

Top View of Rough Deck

Faucet Component and Chair Leg Locations

1-7/8" (4.8 cm) D.

4-1/4" (10.8 cm)

4-3/4" (12.1 cm)

Supplies

Do not cover until the air switch and 
faucet components are installed.

Cover access and complete tile 
after installation is checked.

Tile platform, sides and top access panel.

39-1/8" (99.4 cm)

1-1/2"
(3.8 cm) D.

1-1/4"
(3.2 cm) D.

8-1/4"
(21 cm)

1-1/4"
(3.2 cm) D.

11-1/4"
(28.6 cm)

4"
(10.2 cm)

5-3/4"
(14.6 cm)

19-3/4"
(50.2 cm)

7/16"
(1.1 cm) D.

1063564-2-D

10

Kohler Co.

Summary of Contents for K-1006

Page 1: ...Installation Guide Pedicure Spa K 163 K 1006 K 1011 K 1012 1063564 2 D...

Page 2: ...mation Electrical Requirements The installation must have a Class A Ground Fault Circuit Interrupter GFCI The GFCI protects against line to ground shock hazard Use a 120 V 15 A 60 Hz dedicated service...

Page 3: ...oute Plumbing 6 Install the Footbath 7 Complete the Platform Framing 8 Prepare the Rough Deck Material 9 Begin Tiling the Platform 10 Install the Faucet and Air Switch 11 Cut the Pump Banding Straps 1...

Page 4: ...he height of the stud framing accordingly to meet the required finished height of the deck Observe all local plumbing and building codes including backflow protection The footbath is designed for tile...

Page 5: ...nstructed later Construct the platform framing according to the illustration above Cover the kick plate with plywood Lay the two footbath sled supports onto the stacked 2x4 supports but do not secure...

Page 6: ...the platform as the faucet Determine which side of the footbath that the faucet will be installed Temporarily slide the footbath sled into the framing Position the footbath sled a minimum of 8 1 4 21...

Page 7: ...drain Install the drain to the footbath according to the instructions packed with the drain Slide the footbath sled into the framing Position according to the pencil marks on the framing If necessary...

Page 8: ...e the front footbath jet This bump out will allow the technician to sit closer to the footbath basin Install the bump out to complete the platform framing 3 7 6 cm 9 1 2 24 1 cm 7 3 4 19 7 cm 3 1 2 8...

Page 9: ...3 cm x 12 30 5 cm and located directly over the pump Mark the cutout for the footbath and access panel onto the deck material Cut out the opening for the footbath and access panel in the deck material...

Page 10: ...he platform Mark the hole locations for the faucet handspray air switch and K 1011 client chair if used legs Refer to the above illustration for hole sizes drill the holes for the faucet handspray air...

Page 11: ...eed the tube through the air switch hole Insert the air switch assembly into the hole and press firmly Wipe away any excess sealant Slide the nut over the tube Secure the air switch assembly to the pl...

Page 12: ...the footbath to a level at least 2 5 1 cm above the highest jet Press the air switch to turn on the footbath Allow the footbath to run for approximately 5 minutes and check all piping connections for...

Page 13: ...11 Complete the Platform Cover the platform opening and finish tiling the side of the platform Finish tile here Tile Cover and complete tile installation Kohler Co 13 1063564 2 D...

Page 14: ...e warm water and a liquid detergent to clean the surface Remove stubborn stains paint or tar with turpentine or paint thinner Do not allow cleaners containing petroleum distillates to remain in contac...

Page 15: ...ousing and lightly push and rotate the jet until it snaps into position Do not force the jet NOTE When installed correctly the jet should turn smoothly both clockwise and counterclockwise Troubleshoot...

Page 16: ...t work G Rebuild or replace motor pump 2 Motor starts not all jets are functioning A Jet is closed A Rotate jet trim ring counterclockwise to open B Jet is not installed correctly B Reinstall jet chec...

Page 17: ...1063564 2 D...

Page 18: ...1063564 2 D...

Page 19: ...1063564 2 D...

Page 20: ...USA 1 800 4 KOHLER Canada 1 800 964 5590 M xico 001 877 680 1310 kohler com 2007 Kohler Co 1063564 2 D...

Reviews:

Related manuals for K-1006