2. Provide Electrical Service

WARNING:

Risk of electrical shock. Disconnect the power before proceeding. Refer to the

Important Information

section.

A Ground-Fault Circuit-Interrupter (GFCI) is required for this circuit.

Refer to the roughing-in information to determine the proper outlet location.

Provide a 120 V, 15 A, 60 Hz dedicated circuit.

IMPORTANT!

A licensed electrician must install a GFCI-protected, 120 V, 15 A grounded outlet. No other

load should be on this circuit.

Route the electrical supply and install an outlet within 24” (61 cm) of the pump installation location.

Do not connect the power until directed to do so.

3. Route Plumbing

NOTE:

Faucet can be installed on either the left- or right-side of the footbath. All illustrations show

right-side faucet installations.

NOTE:

The air switch will need to be installed on the same side of the platform as the faucet.

Determine which side of the footbath that the faucet will be installed.

Temporarily slide the footbath sled into the framing.

Position the footbath sled a minimum of 8-1/4

(21 cm) from the outside edge of the faucet-side of

the platform framing. Verify that there is adequate space between the framing and the footbath for
the faucet valving.

With a pencil, mark the footbath position on the frame.

Note the location of the footbath drain outlet.

If necessary, move the sled supports as needed to not interfere with the drain connections.

Remove the footbath and return it to the carton.

Install the rough water supply and drain piping.

IMPORTANT!

When required by local codes, install a RPZ backflow prevention device to each faucet

supply line.

Supply Stops

Sled Supports

Locate the electrical outlet
within 24" (61 cm) of pump.

8-1/4" (21 cm) Min
(clearance for faucet)

Recommended faucet install 
location (either side of footbath)

Footbath Sled

When required, install a RPZ 
to each faucet supply line.

1063564-2-D

6

Kohler Co.

Summary of Contents for K-1006

Page 1: ...Installation Guide Pedicure Spa K 163 K 1006 K 1011 K 1012 1063564 2 D...

Page 2: ...mation Electrical Requirements The installation must have a Class A Ground Fault Circuit Interrupter GFCI The GFCI protects against line to ground shock hazard Use a 120 V 15 A 60 Hz dedicated service...

Page 3: ...oute Plumbing 6 Install the Footbath 7 Complete the Platform Framing 8 Prepare the Rough Deck Material 9 Begin Tiling the Platform 10 Install the Faucet and Air Switch 11 Cut the Pump Banding Straps 1...

Page 4: ...he height of the stud framing accordingly to meet the required finished height of the deck Observe all local plumbing and building codes including backflow protection The footbath is designed for tile...

Page 5: ...nstructed later Construct the platform framing according to the illustration above Cover the kick plate with plywood Lay the two footbath sled supports onto the stacked 2x4 supports but do not secure...

Page 6: ...the platform as the faucet Determine which side of the footbath that the faucet will be installed Temporarily slide the footbath sled into the framing Position the footbath sled a minimum of 8 1 4 21...

Page 7: ...drain Install the drain to the footbath according to the instructions packed with the drain Slide the footbath sled into the framing Position according to the pencil marks on the framing If necessary...

Page 8: ...e the front footbath jet This bump out will allow the technician to sit closer to the footbath basin Install the bump out to complete the platform framing 3 7 6 cm 9 1 2 24 1 cm 7 3 4 19 7 cm 3 1 2 8...

Page 9: ...3 cm x 12 30 5 cm and located directly over the pump Mark the cutout for the footbath and access panel onto the deck material Cut out the opening for the footbath and access panel in the deck material...

Page 10: ...he platform Mark the hole locations for the faucet handspray air switch and K 1011 client chair if used legs Refer to the above illustration for hole sizes drill the holes for the faucet handspray air...

Page 11: ...eed the tube through the air switch hole Insert the air switch assembly into the hole and press firmly Wipe away any excess sealant Slide the nut over the tube Secure the air switch assembly to the pl...

Page 12: ...the footbath to a level at least 2 5 1 cm above the highest jet Press the air switch to turn on the footbath Allow the footbath to run for approximately 5 minutes and check all piping connections for...

Page 13: ...11 Complete the Platform Cover the platform opening and finish tiling the side of the platform Finish tile here Tile Cover and complete tile installation Kohler Co 13 1063564 2 D...

Page 14: ...e warm water and a liquid detergent to clean the surface Remove stubborn stains paint or tar with turpentine or paint thinner Do not allow cleaners containing petroleum distillates to remain in contac...

Page 15: ...ousing and lightly push and rotate the jet until it snaps into position Do not force the jet NOTE When installed correctly the jet should turn smoothly both clockwise and counterclockwise Troubleshoot...

Page 16: ...t work G Rebuild or replace motor pump 2 Motor starts not all jets are functioning A Jet is closed A Rotate jet trim ring counterclockwise to open B Jet is not installed correctly B Reinstall jet chec...

Page 17: ...1063564 2 D...

Page 18: ...1063564 2 D...

Page 19: ...1063564 2 D...

Page 20: ...USA 1 800 4 KOHLER Canada 1 800 964 5590 M xico 001 877 680 1310 kohler com 2007 Kohler Co 1063564 2 D...

Reviews:

Related manuals for K-1006