3. Secure the Bath to the Subfloor

CAUTION: Risk of product damage.

Do not support the bath by the rim.

Choose the installation option that best applies to your particular installation.

If the subfloor is not level, shim the bath support blocks as necessary.

Option 1: Secure Using Cement or Mortar Bed

Spread a 2

(5.1 cm) thick layer of cement or mortar on the subfloor where the bath will be placed.

This will help secure, level and support the bath.

NOTE:

The support blocks must rest directly on the support floor.

Clear all the material away from the support block locations.

NOTE:

Do not use gypsum cement or drywall compound for this application, as they will not provide an

acceptable, durable bond.

Position a piece of plastic drop cloth or similar material over the cement or mortar bed.

With help, carefully lift the bath into place and make sure the support blocks do not rest in the bed
material. Verify that the bath is level and resting on all support blocks.

Insert the drain tailpiece into the trap.

NOTE:

An access panel will simplify future maintenance.

Option 2: Secure Using Construction Adhesive

Apply a generous amount of high-quality construction adhesive to the bottom of the support blocks.

With help, carefully lift the bath into place and verify it is level and resting on all support blocks.

Insert the drain tailpiece into the trap.

NOTE:

An access panel will simplify future maintenance.

Option 3: Secure Using Silicone Sealant

With help, carefully lift the bath into position.

Insert the drain tailpiece into the trap.

Verify that the bath is level and resting on all support blocks.

Apply a continuous bead of silicone sealant around the entire rim of the bath.

NOTE:

An access panel will simplify future maintenance.

Clear spaces 
for support 
blocks.

Apply a bead of 
silicone sealant 
around the entire rim 

or 

Apply construction 
adhesive to the 
support blocks.

Spread a 2" 
(5.1 cm) layer 
of cement or 
mortar bed 
material.

1014128-2-D

4

Kohler Co.

Summary of Contents for K-1013

Page 1: ...rylic Drop In Baths M product numbers are for Mexico i e K 12345M Los n meros de productos seguidos de M corresponden a M xico Ej K 12345M Fran ais page Fran ais 1 Espa ol p gina Espa ol 1 K 1013 K 11...

Page 2: ...gned for drop in or raised deck installation The installation of a rim mounted faucet is not recommended with this bath Observe all local plumbing and building codes Unpack and inspect the bath for da...

Page 3: ...floor or construct a frame for a raised deck installation according to the roughing in information Ensure that there is a 1 16 2 mm gap between the finished deck floor surface so the bath does not re...

Page 4: ...t in the bed material Verify that the bath is level and resting on all support blocks Insert the drain tailpiece into the trap NOTE An access panel will simplify future maintenance Option 2 Secure Usi...

Page 5: ...terial Install the finished wall Seal the joints between the bath rim and the finished wall with silicone sealant Install the faucet trim according to the faucet manufacturer s instructions Clean Up P...

Page 6: ...llation encastr e ou sur podium L installation d un robinet montage sur rebord n est pas recommand e pour cette baignoire Respecter tous les codes de plomberie et de b timent locaux D baller la baigno...

Page 7: ...allation sur podium selon le plan de raccordement S assurer qu il y ait un espace de 1 16 2 mm entre la surface du comptoir sol fini de mani re ce que la baignoire ne repose pas sur le rebord Position...

Page 8: ...iau de l embase S assurer que la baignoire soit nivel e et qu elle s appuie sur tous les blocs de support Ins rer la pi ce de raccordement du drain dans le siphon REMARQUE Un panneau d acc s faciliter...

Page 9: ...mur Installer le mur fini Sceller les joints entre le rebord de la baignoire et le mur fini l aide de silicone Installer la bague de garniture du robinet conform ment aux instructions du fabricant Pro...

Page 10: ...larse empotrada o sobre cubierta elevada No se recomienda instalar las grifer as sobre el borde de la ba era Cumpla con todos los c digos locales de plomer a y de construcci n Desembale la ba era y re...

Page 11: ...sobre cubierta elevada conforme a la informaci n contenida en el diagrama de instalaci n Aseg rese de que haya un espacio de 1 16 2 mm entre la superficie de la cubierta piso acabados de manera que l...

Page 12: ...que que la ba era est nivelada y apoyada sobre todos los bloques de soporte Inserte el tubo de desag e en el sif n NOTA Un panel de acceso facilitar el mantenimiento futuro Opci n 2 Fije con adhesivo...

Page 13: ...acabada Selle las uniones entre el borde de la ba era y la pared acabada con sellador de silicona Instale la guarnici n de la grifer a seg n las instrucciones del fabricante Procedimientos de limpiez...

Page 14: ...1014128 2 D...

Page 15: ...1014128 2 D...

Page 16: ...USA 1 800 4 KOHLER Canada 1 800 964 5590 M xico 001 877 680 1310 kohler com 2005 Kohler Co 1014128 2 D...

Reviews: