14
106548-
CA
(9437)
Kohler Co., Kohler WI
2.
Recessed Installation: Suggested stud
construction is illustrated.
D. PLUMBING PREPARATION
Position plumbing according to roughing-in dimensions.
Cap supplies and check for leaks.
10. BEFORE INSTALLING UNIT
A. TILING-IN BEAD INSTALLATION
Before setting bath, an optional tiling-in bead is
recommended to be applied to whatever side of the bath
contacts the wall. Refer to Ordering Information located
in Roughing-In section beginning on page 5. This bead
prevents water from seeping between the bath and the
wall. Install this bead now. Refer to Installation
Instructions packed with the tiling-in bead.
B. PARTIALLY INSTALL BATH DRAIN
Install drain on bath/whirlpool according to
manufacturer’s instructions.
C. PROTECT BATH UNIT
Place a drop cloth or similar material in bath/whirlpool
bottom. Be careful not to scratch product.