Air Blower Connection
Assemble nozzle connection onto blower.
IMPORTANT :
Maximum standard length of flexible blower hose 1.5 metres. If blower installation is greater
than specified distance then an extension kit will be required
NOTE :
Hose connection to manifold is factory fitted.
□ Push the rubber cuff onto blower nozzle and secure in position with hose clip.
□ Connect the blower to the control box.
Hose Clip
Connector
Rubber Cuff
Flexible Hose
Manifold
Push rubber cuff onto blower nozzle
and secure in position with hose clip.
Connect the blower to the control box.
Maximum Distance 1.5 metres
Kohler Co.
7
1241693-X2-B
Summary of Contents for K-97260X
Page 1: ...Installation and Care Guide Dual System Bath 1241693 X2 A 2018 Kohler Co K 97260X...
Page 12: ...0 2204 6222 Earth Ground ELCB 1241693 X2 B 12 Kohler Co...
Page 13: ...ELCB 220 240 20 50 60 50x 45 Kohler Co 13 1241693 X2 B...
Page 14: ...390 15 0 4 2 5 4 2 1 2 300 400 2 1500 500 700 Brick 2 1241693 X2 B 14 Kohler Co...
Page 15: ...A B A 560 600 A B A B Kohler Co 15 1241693 X2 B...
Page 17: ...1 5 1 5 Kohler Co 17 1241693 X2 B...
Page 18: ...40 40 C 104 F 40 C 104 F 40 1241693 X2 B 18 Kohler Co...
Page 20: ...1 2 3 20 2 30 5 3 3 Power Water Fault 1241693 X2 B 20 Kohler Co...
Page 21: ...1 ELCB 2 30 ELCB ELCB 3 30 4 5 6 Kohler Co 21 1241693 X2 B...
Page 22: ...1241693 X2 B Kohler Co...
Page 23: ...Kohler Co 1241693 X2 B...