-1-
·
·
·
·
·
·
This instruction contains important information
concerning the installation of integrated acrylic bath
and integrated massage bath. (Integrated massage
bath refers to massage bath and BBM with airjets.)
For the installation of other bath, please ignore
these instructions concerning massage bath.
Please read these instructions carefully to
familiarize yourself with the required tools, materials,
and installation sequences. Follow the sections that
pertain to your particular installation. This will help
you avoid costly mistakes. In addition to proper
installation, read all operating and safety instructions.
All information is based on the latest product
information available at the time of publication.
Kohler China Ltd. reserves the right to make
changes in product characteristics, packaging, or
availability at any time without notice.
These instructions contain important care, cleaning,
and warranty information-
Please provide adequate available space for the
bath unit in accordance with rough-in. Arrange the
location of drain in advance.
All installations must comply with council and local
authority by-laws. It is the responsibility of the installer
to ensure that the waste is made watertight by means
of silicone sealant or caulking compound.
Bath drain supplies and electric wiring should be
arranged preliminarily according to the selected bath.
please leave these
instructions for the consumer.
IMPORTANT:
NOTE:
Bath can be installed after the wall is completed.
·
·
·
·
·
·
(
)
BEFORE YOU BEGIN
INTEGRATED ARCYLIC BATH
INSTALLATION INSTRUCTIONS
, 2012
Copyright Kohler China Ltd., 2012
368
201419
A.
·
·
A. Summary Of Key Requirements
Observe all local plumbing codes.
Install the unit to a level subfloor.
·
·
B. Product Inspection
Uncrate and inspect bath for damage. Leave all
materials in carton during construction to prevent
damage.
Damage occurred during transit shall not be
covered by warranty.
NOTE:
B.
PRODUCT REQUIREMENTS
1206725-T01-A