Site Requirements
A. Old Bath Removal (If Applicable)
Disconnect the drain at the trap. Remove the old wall material. Slip boards under the old bath feet to protect the
floor, and slide the old bath out of the recess as illustrated.
Old Bath
F
loor Protection Boards
Bath
2 mm
Tile
Brick
Bath may be installed next to the
wall or as an island installation
.
Tile
Brick
B. Prepare the Site
CAUTION: Risk of product damage.
NOTICE:
Do not support the bath by the rim.
Unless otherwise specified, floor support under the bath must provide for a minimum of 80
lbs./square foot (390 kg./square meter) loading.
Make sure the flooring offers adequate support for your bath, and verify that the subfloor is flat and level.
This bath may be installed in a drop-in or in an island installation. An island installation requires a four side
surround. In both instances, make sure the deck is adequately supported.
Install an access panel to allow the blower, the controller and the keypad to be serviced. Jalousie access is
recommended. Please refer to rough-in for exact location of access panel.
Construct brick or concrete supports.
Provide a 2mm gap between the bath rim and the concrete or brick framing.
1
1
1
1
1
4
1276616-T01-A
Summary of Contents for KARESS Series
Page 11: ...1 1 1 1 QB 2585 2007 A B GFCI 11 1276616 T01 A ...
Page 13: ...A 2 mm B 80 390 2 1 1 1 1 1 13 1276616 T01 A ...
Page 14: ...B 1 1 1 1 A B C D E A 1 1 1 1 1 50 14 1276616 T01 A ...
Page 15: ...C GFCI 220 10 GFCI 1 1 D 1 1 1 1 1 1 1 1 1 350 E 15 1276616 T01 A F 1 ...
Page 16: ...H I 12mm 6mm 1800 12mm 900 600 1 A 350 16 1276616 T01 A G 1 1 1 ...
Page 17: ...1 1 1 1 1 1 1 350mm 1 1 1 1 1 1 L1 L2 L1 C 17 1276616 T01 A B ...