6. Install DC Power Unit
Battery
Box
Power Cord
Power Cord
LED
IMPORTANT! Verify that you are following the correct power system installation
based on your model number. For a hybrid power unit installation, refer to ″Install
Hybrid Power Unit″.
Unthread the control box screws to remove the control box cover.
Unthread the battery box screws to remove the battery box cover.
IMPORTANT! In the event of leaking batteries, replace battery box and batteries.
NOTE: Do not mix used and new batteries.
Insert four AA batteries (LR06) (provided). Refer to the battery cover for battery
orientation.
Reinstall the battery box cover and secure with the screws.
Connect the power cords.
Place the battery box into the empty space within the control box.
Secure the control box cover to the control box.
IMPORTANT! The area in front of the sensor must be free of objects during the 2
minute learning cycle or the faucet may not function properly.
Allow 2 minutes for the sensor to cycle through the automatic sensing distance.
1357694-2-
B
10
Kohler Co.
Summary of Contents for Kumin K-104K36-SANA-CP
Page 49: ...Kohler Co 49 1357694 2 B ...
Page 50: ...1357694 2 B 50 Kohler Co ...
Page 51: ...Kohler Co 51 1357694 2 B ...