background image

12

111835-

CA

 (1093)

 Kohler Co., Kohler WI

D.  CONNECT CONTROL BOX - 230 V, 50 HZ

Connect service to the field wiring compartment of the
control box. The 50 Hz model control box contains blue
and brown wires and earth lug.

A 230 V, 15 A, 50 Hz dedicated circuit is required.
Provide an Earth Leakage Circuit Breaker.

Provide a separate equipment earthing conductor for the
inside earth lug. The earthing conductor must not be
connected to any current carrying conductor.  Follow
local electrical codes. A 230 V, 15A, 50 Hz separate
circuit is required.

Earth
(Ground) Lug

Earth
(Ground)

Neutral

Earthing Lug (for
bonding in accor-
dance with national
and local codes)

Blue
(Neutral)

Brown
(Phase)

Wire Connectors

Phase (Line)

10.  WATER TEST WHIRLPOOL & ELECTRONICS

Check all electrical connections. Make sure both
connections to the pump are securely tightened.

Fill bath to a level at least 2” above the top of the highest
jet.

Operate whirlpool for 5 minutes and check all whirlpool
harness (piping) connections for leaks.

For additional information on whirlpool operation, see
Whirlpool Start-Up Instructions on page 14.

11.  COMPLETE FINISH WALL

CAUTION: Risk of product damage.  Do not
support the weight of the whirlpool by the rim.

Protect whirlpool surface. Make sure the vinyl bead is
attached securely to the sides being built into the wall.
Cover framing and walls with gypsum wallboard.

Tape and mud drywall...seal drywall and joints under
bath rim. Install finished wall material to subwall. Seal
joints between the whirlpool rim and finished wall using
silicone sealant.

Gypsum Wallboard Subwall

Finished Wall Material

Water-Resistant Sealant

2 x 4 Studding

Vinyl Tiling-In Bead

Bath Rim

Summary of Contents for Maestro K-842-V-AB

Page 1: ...R Maestro Whirlpool Baths K 842 V AB K 842 JA AA K 845 V AB K 845 JA AA 111835 CA 1093 Copyright E1993 Kohler Co...

Page 2: ...cted by a qualified licensed electrician For J1 and JA models only A green colored terminal or a wire connector marked G GR GROUND or Grounding is provided within the terminal compartment To reduce th...

Page 3: ...d Wiring Control Box Compartment 230 V 50 Hz 11 Connect Control Box 230 V 50 Hz 12 WATER TEST WHIRLPOOL ELECTRONICS 12 COMPLETE FINISH WALL 12 COMPLETE INSTALLATION 13 Install Handles and Spout 13 Ins...

Page 4: ...rial contacts any top surface of bath K 9621 are sold separately and are required accesso ries B REQUIRED ELECTRICAL SERVICE Dedicated circuits required protected with Class A Ground Fault Circuit Int...

Page 5: ...instructions thoroughly before beginning installation including the following Product Requirements NOTICE Follow all local plumbing and electrical codes B FACTORY ASSEMBLED FEATURES Factory installed...

Page 6: ...CTIONS AND SERVICE ACCESS Before installation ensure proper access to the final connections NOTICE Provide unrestricted service access to the pump An access panel 20 W x 15 H minimum must be construct...

Page 7: ...sealant C CLEARANCE REQUIREMENTS Check roughing in and room dimensions in order to provide adequate available space for the bath unit D NEW OR REPLACEMENT INSTALLATION REQUIREMENTS This bath unit can...

Page 8: ...educe the risk of water damage C STUD POCKET PREPARATION Construct a recess designed for your particular installation Framing is of 2 x 4 construction When constructing framing allow for thickness of...

Page 9: ...s 6 BEFORE INSTALLING UNIT A TILING IN BEAD INSTALLATION Before setting bath an optional tiling in bead is recommended to be applied to whatever side of the bath contacts the wall Refer to Ordering In...

Page 10: ...f feet are not accessible from back or side Metal Shims Metal Shim B INSTALL PLUMBING CAUTION Risk of damage to whirlpool bottom and subfloor Ensure watertight seal on bath drain connections 1 When wh...

Page 11: ...the factory A licensed electrician must install a GFCI protected 120 Volt 15 Amp grounded outlet Your whirlpool may then be plugged into this outlet No other load should be on this circuit Locate the...

Page 12: ...ONICS Check all electrical connections Make sure both connections to the pump are securely tightened Fill bath to a level at least 2 above the top of the highest jet Operate whirlpool for 5 minutes an...

Page 13: ...r installation do not use abrasive cleaners as they may scratch and dull the module surface Use warm water and one of the liquid detergents to clean the surface Stubborn stains paint or tar can be rem...

Page 14: ...the top of the highest jet Water temperature in the whirlpool should not exceed 104_F 40_C Bath Wall 2 Minimum Water Line Jet Trim B OPERATING SEQUENCE Refer to chart for proper operating sequence 1...

Page 15: ...unterclockwise to open are not functioning B Trim kit installed incorrectly B Reinstall trim kit checking for damage to O Ring C Jets are blocked C Remove blockage 3 Motor turns water is pumping but A...

Page 16: ...R 111835 CA 1093 Kohler Co Kohler WI...

Reviews: