10
1383572-W2-A
1. The plumbing installation must comply with all national or local water regulations
and all relevant building regulations, or any particular regulation or practice
specified by the local water supply company.
2. The shower is designed to operate with a gravity fed water supply providing
a pressure from 0.8 kPa* (0.008 bar / 80 millimetres head) to 100 kPa (1 bar
/ 10 metres head, the vertical distance from the base of the cold water cistern
to the top of the shower unit). The shower must have its own separate supply
from the cistern.
DO NOT FIT THE SHOWER TO A MAINS WATER SUPPLY OR WHERE THE
MAXIMUM SPECIFIED PRESSURE MAY BE EXCEEDED!
Failure to comply with these restrictions may result in product damage not
covered by the guarantee.
*
Note:
In practice the minimum head required will increase with pipe length.
See
“Pipework”
for further guidance which includes a calculation table to make
sure that adequate head is available for any given installation.
Plumbing
Installation Requirements
Incorrect Cistern Take Off
Debris from the bottom of the
cistern and air generated when
the cistern refills will enter the
shower supply.
Correct Cistern Take Off
Positioned away from the ball
valve, with a 25 mm distance
from the base of the cistern.
This connection will prevent
air and debris entering the
shower supply.
To shower
unit only.
25 mm
25 Gallon/113 Ltr Cistern
Summary of Contents for Mira Elite SE
Page 35: ...35 1383572 W2 A Notes ...