background image

-4-

IMPORTANT CONSUMER INFORMATION

IMPORTANT CONSUMER INFORMATION

CARE AND CLEANING

To keep your lavatory looking new, make sure you rinse it out
thoroughly after each use.

on this

product, as they will scratch and ruin the surface. Stubborn
stains, paint, or tar can be removed with turpentine or paint
thinner.

DO NOT USE ABRASIVES

Caution! Risk of product damage.

Many cleaners contain abrasive and chemical substances,
and should not be used for cleaning stainless steel, enamel,
plated or plastic fittings.

These finishes should be cleaned using a mild washing up
detergent or soap solution, rinsed and then wiped dry with a
soft clean cloth.

1.

1288760-0

4

2.

3.

4.

Install the Plumbing

1. Install drain 1288760-0 according to the manufacturer's

instructions. The two overflow pipes shall be fixed onto the
outlet valve. Fix the overflow head assembly vertically onto
the faucet supply pipe with plastic tie, as shown in Fig.4.
The overflow pipes can be fixed on either the right side or
the left side of the supply pipe and shall not interfere with
the lift rod. The height of the overflow head assembly will
affect the overflow level and can be adjusted if necessary.

please

lower the height of the overflow head.

Make sure a watertight seal exists on all

basin drain connections.

Provide access to the plumbing connections

for future plumbing maintenance.

2. Connect the hot and cold water supplies.

3. Open the hot and cold water valves, and check the supply

connections for leaks.

4. Run water into the basin, and check the drain connections

for leaks.

Caution!

Caution!

If the water level is too high to affect the overflow,

Fig.#4

4

Lift rod

Plastic Tie

Faucet Supply Pipe

Overflow Head Assembly

Overflow Pipe

Outlet Valve

1269083-T01-B

Summary of Contents for MODERN LIFE K-77835T-1

Page 1: ...onform to tolerances established by ASME Standards A112 19 2 2013 The product complies with GB T 6952 2015 Make sure that the wall and floor are square and plumb to ensure proper installation IMPORTANT ASME A112 19 2 2013 GB T 6952 2015 ORDERING INFORMATION Modern Life 600mm Vanity K 77835T 1 4 8 600mm K 77835T 1 4 8 REQUIRED MATERIALS NOT SUPPLIED TOOLS Level Drill with bit 6mm 14mm wrench Framin...

Page 2: ...the supplies and the drain piping The supply stop handles cannot extend more than 76mm from the finish wall when in the open position NOTE Fig 1 1 ROUGHING IN DIMENSIONS ROUGHING IN DIMENSIONS UNIT mm Kohler reserves the right to change marked dimensions without prior notice Reference Value 598 200 66 481 35 45 586 K 77835T 1 K 77835T 4 K 77835T 8 3 35 592 356 481 598 200 66 Installation Side 80 1...

Page 3: ...l attached surface of the lav evenly Apply Silicone sealant along this face Washer Nut Offset Nut Fig 3 3 10mm 65 75mm 1 2 3 2 Drill two 10mm hanger bolt holes at the marks on the wall The nylon anchors is needed for concrete wall supplied Mount hanger bolts to the wall so approximately 65 75mm of each bolt remains exposed 1 Height dimensions marked in fig 2 and fig 3 could be adjusted per your th...

Page 4: ...verflow pipes shall be fixed onto the outlet valve Fix the overflow head assembly vertically onto the faucet supply pipe with plastic tie as shown in Fig 4 The overflow pipes can be fixed on either the right side or the left side of the supply pipe and shall not interfere with the lift rod The height of the overflow head assembly will affect the overflow level and can be adjusted if necessary plea...

Reviews: