3. SELECT P-TRAP OR S-TRAP
to installation
your toilet according to the drain and shut-off valve's
Roughing-in dimensions.
2. ASSEMBLE TANK BOLTS&WASHERS
Slip bolt heads into mounting hole on bottom of tank. Place
large foam washer on base of flush valve.
Place tank on bowl and attach with nuts and washers from
under bowl.
See Fig. #2a.
See Fig.#2b.
NOTE:
Do not use white cement or high lime content
cements to install this toilet. The expansion of cement due to
a rise in temperature may make the toilet crack or cause
damage. Kohler is not responsible for any damage caused by
installation with the use of cement.
2.
2a
2b
3.
Fig.#2a
2a
Fig.#3a
3a
Fig.#3b
3b
S-trap installation
P-trap installation
Fig.#2b
2b
100
120
180
50
180
-4-
100
120
60
Note: This connector is not supplied.
255/305
255/305
1037406-T01-N