1010427-2-
A
Español, Página 5
Français, Page 9
PINOIR
VITREOUS CHINA
PEDESTAL LAVATORY
K-2015
BEFORE YOU BEGIN
NOTES
Observe all local plumbing and
building codes.
Prior to installation, unpack the
new lavatory and inspect it for
damage. Return the lavatory to its
protective carton until you are
ready to install it.
These instructions are for installing
the lavatory to wood frame
construction. For other
installations, supply suitable
bracing and fastening devices of
sufficient size and strength.
The walls and floor must be
square, plumb, and level.
ROUGHING-IN
(S) 10” (25.4cm) (Based on 12” (30.5cm)
risers which may require cutting).
(T) Pop-up drain typically 13-1/8”
(33.3cm).
Fixture dimensions are nominal and
conform to tolerances in ASME Standard
A112.19.2M.
K-2015-8
K-2015-4
K-2015-1
FAUCET
SHELF
FINISHED
FLOOR
(T)
(S)
FINISHED
WALL
3/8” HOT
3/8” COLD
2-5/16”
(5.9cm)
4” (10.2cm)
2-5/16”
(5.9cm)
1-1/4”
OUTLET
4” (10.2cm)
4” (10.2cm)
4”
(10.2cm)
18”
(45.7cm)
6-3/4”
(17.1cm)
2-5/16”
(5.9cm)
6-3/8”
(16.2cm)
3/8” D. MOUNTING
HOLE IN PEDESTAL
22” (55.9cm)
14-7/8” (37.8cm)
7-1/2”
(19.1cm)
6-1/2”
(16.5cm)
33”
(83.8cm)
3-3/4”
(9.5cm)
1/2” D.
ANCHOR
HOLES