36
TS_622_02 PowerWAVE 9500DPA User Manual 26/2/19
All UPS cabling, maintenance and servicing procedures can be carried out from the front of the cabinet, and a front
clearance of at least 1500mm should be provided to enable component replacement.
Figure 4.2 Clearances
4.4.3 Battery cabinet installation
We recommend that where possible the battery is contained in a purpose-designed cabinet installed immediately adjacent
to the UPS cabinet. It can be positioned on either side of the UPS cabinet but we recommended that it is installed on the
right hand side to minimise the length of the interconnecting DC cables.
If the batteries are to be mounted on external battery racks, rather than cabinet mounted, the battery must be sized to take
into account the voltage drop between the battery installation and UPS. Contact Kohler Uninterruptible Power Ltd. for
installation advice and support if necessary.
Key Point:
When installing the UPS cabinet next to an external battery cabinet or battery rack, the battery
cabinet/rack might require more than 1500mm front clearance which must be taken into consideration when
installing a cabinet suite.
Key Point:
The UPS door must be fully opened (to approximately 135°) to enable some major component to be
extracted from the cabinet. If the cabinet is positioned against a wall that protrudes in front of the cabinet you
must allow adequate, additional side clearance. See the clearance diagram for details.
PW9500
(500kW Modular)
1580x1975x940 (w x h x d)
REAR FANS
A
It is necessary to open the left door fully to remove a UPS module.
If the cabinet left side is placed against a protruding wall ensure
sufficient space is provided (C2).
*TOP clearance required to assist cooling airflow if necessary.
C2
B
DD
C1
C1
C1
C1
1500mm
300mm
0mm
135
*400mm
A
B
C1
D
TOP
Min. Clearance
560mm
C2
1500mm
300mm
0mm
135
*400mm
A
B
C1
D
TOP
Min. Clearance
560mm
C2