6. BEFORE INSTALLING UNIT
A. RECOMMENDED INSTALLATION
Illustrated is a recommended installation.
Incorporate framing support for the vertical and
horizontal grab bars, if used. In addition, incorporate
framing support for the hand spray on vertical slide bar,
if used.
Route piping and adapt framing as necessary for the
hand spray supply elbow, pressure-balanced mixer
valve, and high-flow tub filler and valves.
Recommended
Location of Grab
Bars, if Used
B. PARTIALLY INSTALL BATH DRAIN
Install drain on bath according to manufacturer’s
instructions.
C. PROTECT BATH UNIT
Place a drop cloth or similar material in bath bottom. Be
careful not to scratch product.