4. INSTALLATION REQUIREMENTS
A. MATERIALS REQUIRED
Plumbers putty
Silicone sealant
Metal shims
Water-resistant subfloor sealant
Wall coverings, as necessary
Gypsum plaster
NOTE: Site preparation and wall/floor finishing may
require additional materials.
B. TOOLS REQUIRED
Arc pliers or 14” pipe wrench
Rule
Level
Square
Screwdriver
7/16” ratchet or combination wrench
Conventional woodworking tools
Safety shoes
Safety glasses
Pliers
Utility knife
NOTE: Site preparation and wall/floor finishing may
require additional tools.
C. CLEARANCE REQUIREMENTS
Check roughing-in and room dimensions to provide
adequate space for the bath unit.
D. NEW OR REPLACEMENT INSTALLATION
REQUIREMENTS
This bath unit can be installed in new or existing
bathrooms.
For new installations: Position plumbing according to
roughing-in dimensions located on Page 2. Cap the
supplies and check for leaks.
For replacement installations: Remove the old bath,
the old wall material, and the old finished floor material
from the area. Remove any old plumbing which does not
conform to roughing-in requirements.
5. SITE PREPARATION
A. OLD BATH REMOVAL
Disconnect the drain at the trap. Remove the old wall
material. Slip boards under old bath feet to protect
the floor and slide the old bath out of the recess as
illustrated.
Floor
Protection
Boards
Old Bath