8
Kohler Co., Kohler WI
114014-2-
AA
(9537)
10.
COMPLETE FINISH WALL
CAUTION: Risk of product damage. Do not
support the weight of the bath by the rim.
Protect the bath surface. Cover framing and walls with
gypsum wallboard.
Apply a bead of silicone sealant where the gypsum
wallboard meets the bath. Install wall covering so it is
1/16” above enameled surface. Install finished wall
material to subwall. Seal joints under bath rim and
finished wall.
Apply a bead of silicone sealant along the bottom edge
of the apron. It is not necessary to apply additional
silicone sealant to the optional drain shroud assembly
É
É
É
É
É
Finished Wall Covering
Gypsum Wallboard
Silicone
Sealant
2x4 Studding
Bath Cross
Section
11.
COMPLETE INSTALLATION
A. INSTALL HANDLES AND SPOUT
After the deck is finished, attach the handles and spout
to complete the faucet installation according to the
faucet manufacturer’s instructions.
12.
CLEAN-UP AFTER INSTALLATION
When cleaning up after installation, do not use
abrasive cleansers as they may scratch and dull the
bath surface. Use warm water and a liquid detergent to
clean the surface.
Stubborn stains, paint, or tar can be removed with
turpentine or paint thinner. Do not allow cleaners
containing petroleum distillates to remain in
contact with the bath surfaces for long periods of
time. Plaster can be removed by scraping with a wood
edge. Do not use metal scrapers, wire brushes, or other
metal tools. A powder-type detergent may be used on a
damp cloth to provide mild abrasive action to the residual
plaster.
13.
IMPORTANT CARE AND CLEANING INFORMATION
Quality Kohler enamel is fused to red-hot cast iron. The
resulting glass-hard surface and lustrous depth of color
is beautiful to look at, easy to care for, and more resistant
to scratching than plastic materials. As with any smooth
surface, however, avoid using abrasive cleansers on
your cast iron bath. Abrasive cleansers will scratch and
dull the surface over time.