6. Prefit the Wall Surrounds
Place the back wall on the bath.
Temporarily install a roofing nail or equivalent over the top of the nail flange into the center of a
stud. Do not drive the nail in so far that it interferes with the remaining wall.
Position both end walls ensuring that the wall interlock pins are engaged.
Do not secure the walls to the stud framing at this time.
Verify that the assembled wall surround is resting properly on the bath. If required, remove the
roofing nail at the back wall.
Verify that the end walls are flush with the edge of the bath. If required, push or pull the end walls
into position.
While assembled, check fit and verify that the surround walls are properly aligned with the studs at
the upper and vertical nailing flanges.
If required, add shims to bring the studs into contact with the wall surround.
End Wall
Bath
Bath
Roofing Nail
End Wall
Back Wall
End Wall
End Wall
Pin
Back Wall
Interlock Slot
Back Wall
Nailing Flange
Base Rim
Backwall Clip