1237458-T01-A
-7-
Fig.16
16
Fig.17
17
Fig.18
18
G. Install and uninstall the Fixture, Valve Battery Box
Assembly
G.
Unscrew the screws on the Fixture, Valve, Battery Box
Assembly and withdraw the clamp. Remove the Fixture, Valve
Battery Box Assembly from the urinal by moving it rightwards
and then downwards. Fix the Fixture, Valve Battery Box
Assembly back to the urinal by doing the above steps
inversely.
Screw
Clamp
Stop_Filter Assy
Stop_Filter Assy
Outer diameter of
bush is no more
than 25mm
<25mm
H. Power Connection
H.
1. Please directly reference to Fig.21 when installing K-5888T,
K-5888T-W or K-5888T-Y(DC).
2. Please match 16306T-NA AC power unit when installing K-
5888T-C05, or K-5888T-WC05, or K-5888T-YC05(AC). The
way of installation is as shown.
1.
K-5888T
K-5888T-W
K-5888T-Y
21
2.
K-5888T-C05
K-5888T-WC05
K-5888T-
YC05
16306T-NA
CAUTION:
a. Do not connect 220V AC Power supply to
DC wiring terminal.
b. Do not damage the covering of AC power
unit or remove screws to avoid leakage.
a.
220V
b.
A. Fig.18: AC power unit connect way:
AC power unit is connected to electric control box
by connection wire.
A.
18
AC
Connector
Wire prepared
by customer
Connector
Connect with the same color wire,
and protect connect area by insulation tape.
16306T-NA
AC Power Unit
Control Box Assy.
Wall
Floor
600
300
Outer diameter of bush is no
more than 25mm
<25mm