5
111864-2-
BA
(-)
Kohler Co., Kohler, WI
TO CONNECT WATER SUPPLY
NOTICE: Read carefully before performing this step.
For supply installation, refer to instructions packed with
shut-off valve. Carefully bend tubing to fit.
Cut tubing end 1/4” longer than distance between shut-off
valve and supply shank. Remove any burrs from inside of
tube.
Slip coupling nut, compression nut, and ferrule onto
tubing. Insert tubing into shut-off valve and supply shank,
positioning seal washer (supplied) or compression
washer (not supplied) as shown. Hand-tighten coupling
nut and then tighten compression nut.
WARNING: Risk of external leakage. The fill
valve nut has been factory-tightened to design
specifications. If re-tightening is required, wrench
tighten one turn past finger tight.
Fig. #8
Tubing
Ferrule
Supply Shank
Seal Washer
Coupling Nut
Compression Nut
Shut-Off Valve
Tubing
Ferrule
Supply Shank
Compression Washer
Coupling Nut
Compression Nut
Shut-Off Valve
Turn shut-off valve on and check for leaks. If connections
are squarely assembled, a slight retightening of the nuts
will stop any leaks.
If toilet is leaking in between the tank and bowl, carefully
retighten the three tank bolts evenly. Check all bowl and
tank connections for leaks for several days.
Fig. #9
Hold float under water for a few seconds to fill ballast.
Adjust float by sliding it up or down on float rod until water
level is at the marked water line on the flush valve over-
flow.
Check all connections for leaks for several days.
Float
Float Rod
Fig. #10