PNC-12 EXTREME
14
Arc voltage feedback control cable:
1 set (T95D01896)
Arc
voltage
control
cable:
1
set
(T95D01910)
Initial
positioning
control
cable:
1
set
(T95D01898)
3P
control
cable:
1
set
(T95D01900)
Plasma motorized Up/Down control cable: 1 set (T95D01936)
3.2.3
Connect Main Body Unit to Longitudinal Guide Rail
Firstly, place the longitudinal guide rail on a flat ground. Next, set the guide rail slider beneath the main
body according to the straight-line guide rail and then gently push it to the longitudinal guide rail (see
Figure 1).
1 Main body unit
2 Longitudinal guide rail
3.2.4
Installation of Cross Bar
Gently deliver the transverse aluminum guide rail to the transverse guide pulley according to the direction
shown in the diagram to assure smooth gearing of rack and Main body. (See Figure 2)
1 Main body unit
2 Cross bar