MAINTENANCE PLAN
223
4.7.8 MAINTENANCE EVERY 250 HOURS OF OPERATION
4.7.8.a
ADJUSTING THE FAN BELT TENSION
Carry out the following operations together with those to be performed every 50 HOURS.
The fan belt can be reached after opening the engine hood (see
“3.5.1 ENGINE HOOD”).
The control is manual: press the belt (1) with a thumb on the in-
dicated pont with a force equal to approx. 10 kg; the resulting de-
flection must be approximately 10-15 mm.
If the deflection exceeds this value, loosen the screw (2) that fas-
tens the alternator (3) and, with a lever inserted between the en-
gine block and casing, make the alternator slide.
Lock the screw (2) again and check again.
Use a 12 mm spanner.
A - Fan pulley
B - Alternator pulley
IMPORTANT
☞
•
If the belt is worn, change it and check the tension again
after a few hours of operation.
RWAA0140
1
3
RWA02890
10 ÷ 15 mm
A
B
RWAA0150
2
3
Summary of Contents for 97SF11205
Page 2: ......
Page 12: ...10 THIS PAGE WAS INTENTIONALLY LEFT EMPTY ...
Page 21: ...SAFETY AND ACCIDENT PREVENTION ...
Page 56: ...54 THIS PAGE WAS INTENTIONALLY LEFT EMPTY ...
Page 57: ...THE MACHINE AND ITS OPERATIONS ...
Page 179: ...MAINTENANCE ...
Page 251: ...TECHNICAL SPECIFICATIONS ...
Page 257: ...AUTHORISED OPTIONAL EQUIPMENT ...