10-79
WB97S-5
STRUCTURE AND FUNCTION
PPC VALVES
OPERATION
1. Control lever in neutral position
•
Shovel PPC valve
Control valve ducts
A
and
B
and PPC valve ducts
P1
and
P2
are connected to discharge chamber
D
by
means of the calibrated hole
f
in spool (1).
•
Shovel raise PPC valve
Control valve ducts
A
and
B
and PPC valve ducts
P3
and
P4
are connected to discharge chamber
D
by
means of the calibrated hole
f
in spool (1).
RKZ08990
T
P
f
D
P1
P2
1
T
P
D
P4
P3
1
f
A
B
A
B
Control
valve
Control
valve
Summary of Contents for WB97S-5
Page 1: ...WEBM007500 WB97S 5 BACKHOE LOADER SERIAL NUMBER F00003 and up WB97S 5 SHOP MANUAL ...
Page 2: ......
Page 4: ...PAGE INTENTIONALLY LEFT BLANK ...
Page 48: ...PAGE INTENTIONALLY LEFT BLANK ...
Page 50: ...PAGE INTENTIONALLY LEFT BLANK ...
Page 65: ...PAGE INTENTIONALLY LEFT BLANK ...
Page 144: ...PAGE INTENTIONALLY LEFT BLANK ...
Page 146: ......
Page 161: ...TESTING AND ADJUSTMENTS WB97S 5 20 17 NORMAL OR STANDARD TECHNICAL DATA Fig S RKZ10830 ...
Page 264: ...PAGE INTENTIONALLY LEFT BLANK ...
Page 400: ...PAGE INTENTIONALLY LEFT BLANK ...
Page 508: ...PAGE INTENTIONALLY LEFT BLANK ...
Page 566: ......
Page 581: ...40 15 WB97S 5 STANDARD MAINTENANCE CONTROL VALVE RKZ09071 C C B B A A AE AE X View X ...
Page 589: ...40 23 WB97S 5 STANDARD MAINTENANCE CONTROL VALVE ViewX RKZ09591 C C B B A A AE AE ...
Page 603: ...PAGE INTENTIONALLY LEFT BLANK ...
Page 610: ......
Page 611: ...90 1 WB97S 5 90 OTHER ELECTRICAL DIAGRAM STANDARD VERSION 3 ...
Page 612: ......
Page 614: ......
Page 615: ......
Page 616: ... 2006 KOMATSU UTILITY EUROPE S p A All Rights Reserved Printed in Europe 06 2006 ...