PRECAUTIONS FOR EMERGENCY RECOVERY
41
2.7 PRECAUTIONS FOR EMERGENCY RECOVERY
RWA05380
RWA20170
•
Before moving the machine, make sure that all the controls are
in neutral.
•
Incorrect manoeuvres may result in serious injuries or even
death.
•
To move the machine, use properly dimensioned steel cables;
do not use worn cables or cables with broken strands (A), twist-
ed cables (B), deformed cables (C).
•
During the recovery operation, no one can be allowed to ap-
proach the machines or the cable.
•
Do not stand astride the cable.
•
Move the machine just far enough to permit the required re-
pairs.
•
Put wooden blocks between the towing cable and the machine
body, in order to avoid wear or damage.
•
Do not remove the machine in any way other than that indicated
in paragraph “3.14.1 HOW TO REMOVE THE MACHINE”.
CAUTION
•
The maximum pulling force for the emergency recovery is
the following:
F = 7700 kg.
•
Use cables having the same length and pull continuosly,
without jerking movements.
•
Arrange and couple the machine to be removed by posi-
tioning it on the same axis as the towing vehicle; the force
must be parallel to the axis of movement of the machine.
Summary of Contents for PC110R-1
Page 2: ......
Page 19: ...17 SAFETY AND ACCIDENT PREVENTION...
Page 51: ...49 THE MACHINE AND ITS OPERATIONS...
Page 126: ...124 PAGE INTENTIONALLY LEFT BLANK...
Page 127: ...125 MAINTENANCE...
Page 190: ...188 PAGE INTENTIONALLY LEFT BLANK...
Page 191: ...189 TECHNICAL SPECIFICATIONS...
Page 198: ...196 PAGE INTENTIONALLY LEFT BLANK...
Page 199: ...197 AUTHORISED OPTIONAL EQUIPMENT...