TRANSPORTING THE MACHINE
154
WEAM009300
8.
Install one shackle in the lifting hole provided in the boom,
then pass the metal cable through it.
IMPORTANT
q
Always use the three coupling points provided for lifting
the machine. Do not lift the machine with swung boom or
turret.
q
Pay attention to the pipes and take care that they do not get
caught.
9.
During the lifting operations the angle between the metal
cables must be included between 30° and 40°.
10. When the machine is not in contact with the ground any
longer, check the conditions of the hooks and the lifting
position, then proceed slowly.
AE147970
RKA23040
RKA01470
Summary of Contents for PC14R-3
Page 2: ......
Page 19: ...SAFETY AND ACCIDENT PREVENTION 17...
Page 61: ...THE MACHINE AND ITS OPERATIONS 59...
Page 171: ...MAINTENANCE 169...
Page 221: ...TECHNICAL SPECIFICATIONS 219...
Page 229: ...AUTHORISED OPTIONAL EQUIPMENT 227...
Page 244: ...242 THIS PAGE WAS INTENTIONALLY LEFT EMPTY...
Page 245: ......
Page 246: ...2007 KOMATSU UTILITY EUROPE S p A All Rights Reserved Printed in Europe 12 2007...