TRANSPORTING THE MACHINE
173
8.
Install one shackle in the lifting hole provided in the boom,
then pass the metal cable through it.
9.
Connect the ropes to the upper lifting bar as indicated in the
figure.
IMPORTANT
q
Always use the three coupling points provided for lifting
the machine. Do not lift the machine with swing boom or re-
volving frame.
q
Pay attention to the pipes and take care that they do not get
caught.
10. Lift the machine slowly until the ropes are stretched and
make sure that the fastenings are correct before lifting the
machine definitively.
CAUTION
q
When lifting the machine, make sure that it is correctly bal-
anced and that it remains in horizontal position during the
lifting operations.
q
Do not lift the machine with swung boom or without using
the lifting bar.
AE147970
RKA30100
RKA30110
WEAM012405
Summary of Contents for PC16R-3
Page 2: ......
Page 24: ...22 THIS PAGE WAS INTENTIONALLY LEFT EMPTY WEAM012405...
Page 25: ...SAFETY AND ACCIDENT PREVENTION 23 WEAM012405...
Page 79: ...THE MACHINE AND ITS OPERATIONS 77 WEAM012405...
Page 190: ...188 THIS PAGE WAS INTENTIONALLY LEFT EMPTY WEAM012405...
Page 191: ...MAINTENANCE 189 WEAM012405...
Page 244: ...242 THIS PAGE WAS INTENTIONALLY LEFT EMPTY WEAM012405...
Page 245: ...TECHNICAL SPECIFICATIONS 243 WEAM012405...
Page 253: ...AUTHORISED OPTIONAL EQUIPMENT 251 WEAM012405...
Page 286: ...284 WEAM012405...
Page 287: ......
Page 288: ...2017 KOMATSU ITALIA MANUFACTURING S p A All Rights Reserved Printed in Europe 02 2017...