1.
After connecting the pipes, start the engine and let it idle for approximately 10 minutes (see "3.3.2 STARTING
THE ENGINE").
2.
Extend all cylinders 4-5 times, stopping them at approx. 100 mm from the end of stroke.
IMPORTANT
q
If the engine runs at maximum rpm or if the cylinders are brought to the end of stroke soon after starting,
the air sucked in by the cylinders may damage the piston gaskets.
3.
Slowly make all cylinders reach the end of stroke for 3-4 times.
4.
Press the optional equipment control pedal a dozen times to bleed the equipment circuit completely.
IMPORTANT
q
If the equipment bleeding procedure is explained in the specific manual of the equipment supplied by its
manufacturer, follow the instructions contained therein.
5.
Once the bleeding operation has been completed, stop the engine and wait at least 5 minutes before starting
work.
6.
Make sure that there are no oil leakages and clean any dirty surface.
WEAM012405
Summary of Contents for PC16R-3
Page 2: ......
Page 24: ...22 THIS PAGE WAS INTENTIONALLY LEFT EMPTY WEAM012405...
Page 25: ...SAFETY AND ACCIDENT PREVENTION 23 WEAM012405...
Page 79: ...THE MACHINE AND ITS OPERATIONS 77 WEAM012405...
Page 190: ...188 THIS PAGE WAS INTENTIONALLY LEFT EMPTY WEAM012405...
Page 191: ...MAINTENANCE 189 WEAM012405...
Page 244: ...242 THIS PAGE WAS INTENTIONALLY LEFT EMPTY WEAM012405...
Page 245: ...TECHNICAL SPECIFICATIONS 243 WEAM012405...
Page 253: ...AUTHORISED OPTIONAL EQUIPMENT 251 WEAM012405...
Page 286: ...284 WEAM012405...
Page 287: ......
Page 288: ...2017 KOMATSU ITALIA MANUFACTURING S p A All Rights Reserved Printed in Europe 02 2017...