PRECAUTIONS TO BE TAKEN WHEN WORKING
52
3 - MOVE THE LOAD AWAY IN HORIZONTAL DIRECTION
With an arm extended forwards and the hand in vertical posi-
tion directed towards the load to be moved away, move the
hand in the direction of the movement to be carried out.
4 - BRING THE LOAD NEARER IN HORIZONTAL DIRECTION
With an arm extended forwards and the hand in vertical posi-
tion directed towards the signalman, move the hand in the di-
rection of the movement to be carried out.
5 - LIFT THE BOOM
With an arm extended in horizontal position and closed fin-
gers, point the thumb upwards.
6 - LOWER THE BOOM
With an arm extended in horizontal position and closed fin-
gers, point the thumb downwards.
7 - SWING THE BOOM
With an arm extended in horizontal position, point the forefin-
ger in the desired swing direction.
8 - SWING THE BOOM
With an arm extended in horizontal position, point the forefin-
ger in the desired swing direction.
RKA15160
RKA15170
RKA15180
RKA15190
RKA15200
RKA15210
WEAM012405
Summary of Contents for PC16R-3
Page 2: ......
Page 24: ...22 THIS PAGE WAS INTENTIONALLY LEFT EMPTY WEAM012405...
Page 25: ...SAFETY AND ACCIDENT PREVENTION 23 WEAM012405...
Page 79: ...THE MACHINE AND ITS OPERATIONS 77 WEAM012405...
Page 190: ...188 THIS PAGE WAS INTENTIONALLY LEFT EMPTY WEAM012405...
Page 191: ...MAINTENANCE 189 WEAM012405...
Page 244: ...242 THIS PAGE WAS INTENTIONALLY LEFT EMPTY WEAM012405...
Page 245: ...TECHNICAL SPECIFICATIONS 243 WEAM012405...
Page 253: ...AUTHORISED OPTIONAL EQUIPMENT 251 WEAM012405...
Page 286: ...284 WEAM012405...
Page 287: ......
Page 288: ...2017 KOMATSU ITALIA MANUFACTURING S p A All Rights Reserved Printed in Europe 02 2017...