DEF LEVEL GAUGE
DEF level gauge indicates the remaining level of DEF.
If the indicator is in green range during operations, it is normal.
If the indicator comes close to (A) of red range during opera-
tion, check and add DEF.
(A) to (B): Red range
(A) to (C): Green range
When the indicator is in red range from (A) to (B), DEF level
caution lamp (1) lights up in red.
If DEF level further decreases after the monitor lights up in red,
the engine power is derated. For detail, see “HANDLE UREA
SCR SYSTEM WARNING (3-123)”.
When remaining level of DEF cannot be detected, DEF level caution lamp (1) lights up in white.
REMARK
• Immediately after turning the starting switch to ON position and during the engine is running, DEF level cau-
tion lamp (1) lights up in white. However, this does not indicate abnormality.
• In cold weather, DEF level cannot be detected and DEF level caution lamp (1) lights up in white for approxi-
mately 1 hour. However, this does not indicate abnormality.
• Even if DEF level caution lamp (1) does not light up in white, it may take a long time for DEF level gauge to
display the correct position.
Note that the following cases are not abnormal:
• When DEF is added while the starting switch is kept at ON position.
• When the starting switch is turned to ON position immediately after adding DEF (within approximately
30 seconds).
Before adding DEF, turn the starting switch to OFF position. Wait for a while after adding, then turn the
starting switch to ON position.
MONITOR SWITCHES
(1) Function switch
(2) Working mode selector switch
(3) Auto-deceleration switch
(4) Travel speed selector switch
(5) Wiper switch
(6) Window washer switch
(7) Buzzer cancel switch
(8) Air conditioner switch
OPERATION
EXPLANATION OF COMPONENTS
3-43
Summary of Contents for PC360LC-11
Page 2: ......
Page 22: ......
Page 76: ......
Page 344: ......
Page 425: ...SPECIFICATIONS 5 1 ...
Page 429: ...PC360NLC 11 SPECIFICATIONS SPECIFICATIONS 5 5 ...
Page 430: ......
Page 450: ...PC360LC 11 2 Piece Boom PC360NLC 11 2 Piece Boom 2 PIECE BOOM ATTACHMENTS AND OPTIONS 6 20 ...
Page 457: ...ATTACHMENTS AND OPTIONS 17M LONG REACH BOOM AND ARM 6 27 ...
Page 465: ...ATTACHMENTS AND OPTIONS SUPER LONG FRONT BOOM AND ARM 6 35 ...
Page 499: ...REPLACEMENT PARTS 7 1 ...
Page 515: ......