1.
Press F5 while the “Engine Power Recovery” window is
displayed.
This procedure is split from procedure 4 in “Temporary Re-
storation from Inducement”.
“SCR Information” screen is displayed.
2.
Move any operating lever to display “Standard Screen”.
“Temporary Restoration from Inducement” is deactivated.
Inducement Strategy for abnormalities recurrences within 40 hours
The Urea SCR system continuously monitors its operation conditions and stores information on inappropriate
operations including malfunctions. The stored information is utilized to monitor recurrences of abnormalities,
“Abnormality Recurrence Counter”. “Abnormality Recurrence Counter” is required by the authorities. The recur-
rence monitoring spans 40 hours and it monitors the abnormalities that trigger Inducement other than the
amount of DEF in the tank.
If another abnormality/abnormalities is detected within 40 hours after the previous abnormalities were corrected,
regardless of the level of the previous Inducement and whether the new abnormality/abnormalities is the same
as the previous ones or not, it is judged as a recurrence.
If a recurrence occurs, “Severe Inducement” will be activated.
Inducement in the recurrence resumes counting time at the time when the previous abnormalities were correct-
ed if the previous Inducement is in “ Warning” or “Continuous Warning” or “Low level Inducement”. The alerts
resume the previous Inducement.
If this occurs, utilize “Temporary Restoration from Inducement” and move to the machine to a safe place, and
contact your Komatsu distributor.
The maximum duration of power restoration is 30 minutes and 3 operations are allowed.
To activate “Temporary Restoration from Inducement”, refer to the “Temporary Restoration from Inducement”
section in this manual.
OPERATION
EXPLANATION OF COMPONENTS
3-137
Summary of Contents for PC360LC-11
Page 2: ......
Page 22: ......
Page 76: ......
Page 344: ......
Page 425: ...SPECIFICATIONS 5 1 ...
Page 429: ...PC360NLC 11 SPECIFICATIONS SPECIFICATIONS 5 5 ...
Page 430: ......
Page 450: ...PC360LC 11 2 Piece Boom PC360NLC 11 2 Piece Boom 2 PIECE BOOM ATTACHMENTS AND OPTIONS 6 20 ...
Page 457: ...ATTACHMENTS AND OPTIONS 17M LONG REACH BOOM AND ARM 6 27 ...
Page 465: ...ATTACHMENTS AND OPTIONS SUPER LONG FRONT BOOM AND ARM 6 35 ...
Page 499: ...REPLACEMENT PARTS 7 1 ...
Page 515: ......