7.
If the machine is equipped with work equipment, set the
work equipment at the front, and travel forward to load it; if
it has no work equipment, travel in reverse to load it.
Follow instructions and signals of a conductor particularly
when traveling in reverse.
8.
Before moving the machine onto the ramps, make sure
that the machine is positioned in a straight line with the
ramps and that the centerline of the machine matches that
of the trailer.
9.
Set the travel direction toward the ramps and drive slowly.
Lower the work equipment as far as possible without caus-
ing interference.
On the ramps, operate only the travel lever. Do not operate
any other lever.
10. When loading a machine with the work equipment instal-
led, at the point where the tracks are on both the ramps
and the ground surface, turn the swing lock switch OFF.
11. Swing the upper structure slowly 180 °.
12. Turn the swing lock switch ON to apply the swing lock.
When the swing lock switch is turned to ON position, swing
lock pilot lamp (9) lights up.
(a): ON position
(b): OFF position
OPERATION
TRANSPORTATION
3-239
Summary of Contents for PC360LC-11
Page 2: ......
Page 22: ......
Page 76: ......
Page 344: ......
Page 425: ...SPECIFICATIONS 5 1 ...
Page 429: ...PC360NLC 11 SPECIFICATIONS SPECIFICATIONS 5 5 ...
Page 430: ......
Page 450: ...PC360LC 11 2 Piece Boom PC360NLC 11 2 Piece Boom 2 PIECE BOOM ATTACHMENTS AND OPTIONS 6 20 ...
Page 457: ...ATTACHMENTS AND OPTIONS 17M LONG REACH BOOM AND ARM 6 27 ...
Page 465: ...ATTACHMENTS AND OPTIONS SUPER LONG FRONT BOOM AND ARM 6 35 ...
Page 499: ...REPLACEMENT PARTS 7 1 ...
Page 515: ......