6.
Operate each work equipment control lever and attach-
ment control pedal fully to the front, rear, right, and left a
few times within 15 seconds to release the internal pres-
sure in the hydraulic circuit.
7.
Set the lock lever to LOCK position (L).
8.
Loosen oil filler cap (F) slowly on the top of the hydraulic
tank to release the internal pressure in the hydraulic tank.
9.
Check that the hydraulic oil temperature is low.
10. Remove the plugs (2 places) at the outlet and inlet.
Be careful not to get any dirt or mud on the hose fitting.
If an O-ring is damaged, replace it with a new one.
11. Connect the hose on the attachment side.
Check the direction of flow of the oil and be careful not to
make any mistake.
ATTACHMENTS AND OPTIONS
HANDLE MACHINE READY FOR INSTALLATION OF ATTACHMENT
6-47
Summary of Contents for PC360LC-11
Page 2: ......
Page 22: ......
Page 76: ......
Page 344: ......
Page 425: ...SPECIFICATIONS 5 1 ...
Page 429: ...PC360NLC 11 SPECIFICATIONS SPECIFICATIONS 5 5 ...
Page 430: ......
Page 450: ...PC360LC 11 2 Piece Boom PC360NLC 11 2 Piece Boom 2 PIECE BOOM ATTACHMENTS AND OPTIONS 6 20 ...
Page 457: ...ATTACHMENTS AND OPTIONS 17M LONG REACH BOOM AND ARM 6 27 ...
Page 465: ...ATTACHMENTS AND OPTIONS SUPER LONG FRONT BOOM AND ARM 6 35 ...
Page 499: ...REPLACEMENT PARTS 7 1 ...
Page 515: ......