5.
Pull out projections (2) (6 places) on the back of the floor
mat and remove the floor mat.
6.
Remove the cap from water drain hole (3).
7.
Flush out the dirt on the floor directly with water through
water drain hole (3).
8.
After completing the washing work, install the cap in water
drain hole (3).
9.
Fit the floor mat and secure it by inserting projections (2)
into the holes.
METHOD FOR SETTING MACHINE AT ANGLE
You can set the machine at an angle by using a slope or blocks. Consider the condition of the machine and
select the safe method.
METHOD FOR USING SLOPE
k
k
WARNING
Select a solid and smooth slope.
Always block the tracks from movement, and thrust the work equipment into the ground.
1.
Stop the machine with the work equipment on the downhill side on a slope.
2.
Block the tracks from movement and thrust the work
equipment into the ground.
MAINTENANCE PROCEDURE
MAINTENANCE
4-36
Summary of Contents for PC360LC-11
Page 2: ......
Page 22: ......
Page 76: ......
Page 344: ......
Page 425: ...SPECIFICATIONS 5 1 ...
Page 429: ...PC360NLC 11 SPECIFICATIONS SPECIFICATIONS 5 5 ...
Page 430: ......
Page 450: ...PC360LC 11 2 Piece Boom PC360NLC 11 2 Piece Boom 2 PIECE BOOM ATTACHMENTS AND OPTIONS 6 20 ...
Page 457: ...ATTACHMENTS AND OPTIONS 17M LONG REACH BOOM AND ARM 6 27 ...
Page 465: ...ATTACHMENTS AND OPTIONS SUPER LONG FRONT BOOM AND ARM 6 35 ...
Page 499: ...REPLACEMENT PARTS 7 1 ...
Page 515: ......