SUPER LONG FRONT BOOM AND ARM
ATTACHMENTS ANDD OPTIONS
6-46
MAINTENANCE
6
SPECIAL SERVICE REQUIREMENTS FOR SUPER LONG FRONT WORK EQUIPMENT
6
CAUTION
When working in water or in wet sand, use molybdenum lubricant (LM-P) for the grease.
WARNING
NEVER slew the upper structure of a Super Long Front machine if the boom and arm have ben removed.
In addition to the standard service schedule, described in the main machine manual, the following servicing should
be carried out:
SERVICE ITEM
Page
EVERY 50 HOURS SERVICE
LUBRICATING
1. Arm-Link coupling pin (1 point)
2. Arm-Bucket coupling pin (1 point)
3. Link coupling pin (2 points)
4. Bucket cylinder rod end (1 point)
5. Bucket-Link coupling pin (1 point)
CHECK EVERY 100 HOURS SERVICE
LUBRICATING
1. Arm cylinder foot pin (1 point)
2. Boom-Arm coupling pin (1 point)
3. Arm cylinder rod end (1 point)
4. Bucket cylinder foot pin (1 point)
5. Arm-link coupling pin (1 point)
6. Arm-bucket coupling pin (1 point)
7. Link coupling pin (2 points)
8. Bucket cylinder rod end (1 point)
9. Bucket-Link coupling pin (1 point)
Summary of Contents for PC450-8
Page 2: ......
Page 3: ...FOREWORD 11 ...
Page 66: ...SAFETY MAINTENANCE INFORMATION SAFETY 2 42 ...
Page 351: ...SPECIFICATIONS 15 ...
Page 355: ...SPECIFICATIONS SPECIFICATIONS 5 5 6 7m Boom PC450 8 ...
Page 356: ...SPECIFICATIONS SPECIFICATIONS 5 6 6 7m Boom PC450LC 8 ...
Page 357: ...SPECIFICATIONS SPECIFICATIONS 5 7 6 7m Boom PC450LCHD 8 ...
Page 359: ...SPECIFICATIONS SPECIFICATIONS 5 9 7 0m Boom PC450 8 ...
Page 360: ...SPECIFICATIONS SPECIFICATIONS 5 10 7 0m Boom PC450LC 8 ...
Page 410: ...SUPER LONG FRONT BOOM AND ARM ATTACHMENTS ANDD OPTIONS 6 50 ...
Page 436: ...OPERATION HIGH REACH DEMOLITION EQUIPMENT 27M 7 26 3 Extend arm cylinder Arm cylinder ...
Page 469: ...INDEX 18 ...
Page 470: ...INDEX 8 2 ...
Page 473: ...COLOPHON 18 ...