CONTROL LEVERS AND SWITCHES
HIGH REACH DEMOLITION EQUIPMENT 27M
7-8
WORK EQUIPMENT CONTROL LEVERS
7
(with auto-deceleration device)
This Left work equipment control lever (3) is used to operate the
arm and upper structure.
Arm operation / Swing operation
(a) Arm OUT
(b) Arm IN
(c) Swing to right
(d) Swing to left
N (Neutral):The upper structure and arm are held in position and
do not move.
When High Reach Equipment is fitted, the Shift button (7) is used
together with the left attachment control pedal (6) to control the
Intermediate Link operation.
This Right work equipment control lever (4) is used to operate the
boom and bucket. For machines fitted with hydraulic variable
gauge undercarriage the right control lever also operates the
undercarriage adjustment (in undercarriage adjustment mode)
Boom operation / Bucket operation
(a) RAISE
(b) LOWER
(c) DUMP
(d) CURL
N (Neutral):The boom and bucket are held in position and do not
move.
Hydraulic variable gauge undercarriage mode
(c) Undercarriage wider
(d) Undercarriage narrower
N (Neutral) : Undercarriage is held in position and does not move
REMARK
q
The engine speed for all control levers (travel, work equipment, attachment) is changed as follows by the auto-
deceleration mechanism.
q
When the travel lever and work equipment control levers are at the neutral position, even if the fuel control dial
is above midrange speed, the engine speed will go down to a midrange speed. If one of these levers is oper-
ated, the engine speed will rise to the speed set by the fuel control dial.
q
If all the control levers are at the neutral position, the engine speed goes down approx. 100 rpm, then after
approx. 4 seconds, the engine speed goes down to the deceleration speed (approx. 1400 rpm).
Summary of Contents for PC450-8
Page 2: ......
Page 3: ...FOREWORD 11 ...
Page 66: ...SAFETY MAINTENANCE INFORMATION SAFETY 2 42 ...
Page 351: ...SPECIFICATIONS 15 ...
Page 355: ...SPECIFICATIONS SPECIFICATIONS 5 5 6 7m Boom PC450 8 ...
Page 356: ...SPECIFICATIONS SPECIFICATIONS 5 6 6 7m Boom PC450LC 8 ...
Page 357: ...SPECIFICATIONS SPECIFICATIONS 5 7 6 7m Boom PC450LCHD 8 ...
Page 359: ...SPECIFICATIONS SPECIFICATIONS 5 9 7 0m Boom PC450 8 ...
Page 360: ...SPECIFICATIONS SPECIFICATIONS 5 10 7 0m Boom PC450LC 8 ...
Page 410: ...SUPER LONG FRONT BOOM AND ARM ATTACHMENTS ANDD OPTIONS 6 50 ...
Page 436: ...OPERATION HIGH REACH DEMOLITION EQUIPMENT 27M 7 26 3 Extend arm cylinder Arm cylinder ...
Page 469: ...INDEX 18 ...
Page 470: ...INDEX 8 2 ...
Page 473: ...COLOPHON 18 ...