Park the machine on firm, level ground.
q
Select a place where there is no hazard of falling rocks or
landslides, or of flooding if the land is low.
q
Lower the work equipment completely to the ground.
q
When leaving the machine, set lock lever (1) to the LOCK
position (L), then stop the engine.
q
Always close the operator's cab door, and use the key to
lock all the equipment in order to prevent any unauthorized
person from moving the machine. Always remove the key,
take it with you, and leave it in the specified place.
q
If it is necessary to park the machine on a slope, always do
as follows.
q
Set the bucket on the downhill side, then dig it into the
ground.
q
Put blocks under the tracks to prevent the machine
from moving.
Summary of Contents for PC450-8
Page 2: ......
Page 3: ...FOREWORD 11 ...
Page 66: ...SAFETY MAINTENANCE INFORMATION SAFETY 2 42 ...
Page 351: ...SPECIFICATIONS 15 ...
Page 355: ...SPECIFICATIONS SPECIFICATIONS 5 5 6 7m Boom PC450 8 ...
Page 356: ...SPECIFICATIONS SPECIFICATIONS 5 6 6 7m Boom PC450LC 8 ...
Page 357: ...SPECIFICATIONS SPECIFICATIONS 5 7 6 7m Boom PC450LCHD 8 ...
Page 359: ...SPECIFICATIONS SPECIFICATIONS 5 9 7 0m Boom PC450 8 ...
Page 360: ...SPECIFICATIONS SPECIFICATIONS 5 10 7 0m Boom PC450LC 8 ...
Page 410: ...SUPER LONG FRONT BOOM AND ARM ATTACHMENTS ANDD OPTIONS 6 50 ...
Page 436: ...OPERATION HIGH REACH DEMOLITION EQUIPMENT 27M 7 26 3 Extend arm cylinder Arm cylinder ...
Page 469: ...INDEX 18 ...
Page 470: ...INDEX 8 2 ...
Page 473: ...COLOPHON 18 ...