4.
Pull the track frame until it reaches the stopper, then lower
the machine to the ground, and tighten the bolts (1) (16
pieces each on the front and rear on one side).
5.
Tightening torque: 1960 to 2450 Nm {200 to 250 kgm}
6.
Work on the track frame on the other side in the same way.
• Perform the track frame gauge spreading work on a
level hard ground.
• Never operate the cylinders suddenly during the track
frame gauge spreading work. It is dangerous.
TRANSPORTATION
OPERATION
3-232
Summary of Contents for PC700LC-11
Page 2: ......
Page 23: ...LOCATION OF SAFETY LABELS 5 SAFETY SAFETY LABELS 2 3...
Page 66: ......
Page 316: ......
Page 396: ......
Page 397: ...SPECIFICATIONS 5 1...
Page 401: ...For 7 6m Boom SPECIFICATIONS SPECIFICATIONS 5 5...
Page 402: ...SPECIFICATIONS SPECIFICATIONS 5 6...
Page 426: ......
Page 427: ...REPLACEMENT PARTS 7 1...
Page 434: ......