• If the machine sinks in mud and cannot get out under its
own power, or if the machine tows a heavy object, use a
wire rope as shown in the figure on the right.
• Place pieces of wood between the wire ropes and the ma-
chine to prevent damage to the ropes and the machine.
• Hold the wire rope level and set it straight to the track
frame.
• When towing a machine, travel at a speed of less than 1
km/h
for a distance of only a few meters to a
place that is suitable for performing repairs.
Perform this only in an emergency.
PRECAUTIONS FOR SEVERE JOB CONDITION
• When performing digging operations in water, if the work equipment mounting pin goes into the water, per-
form greasing every time the operation is performed.
• For heavy-duty operations and deep digging, perform greasing of the work equipment mounting pins every
time before operation.
After greasing, operate the boom, arm and bucket several times, then grease again.
TROUBLES AND ACTIONS
OPERATION
3-240
Summary of Contents for PC700LC-11
Page 2: ......
Page 23: ...LOCATION OF SAFETY LABELS 5 SAFETY SAFETY LABELS 2 3...
Page 66: ......
Page 316: ......
Page 396: ......
Page 397: ...SPECIFICATIONS 5 1...
Page 401: ...For 7 6m Boom SPECIFICATIONS SPECIFICATIONS 5 5...
Page 402: ...SPECIFICATIONS SPECIFICATIONS 5 6...
Page 426: ......
Page 427: ...REPLACEMENT PARTS 7 1...
Page 434: ......