1) Set the boom to the swing neutral position and supply
grease to the pin.
2) Swing the boom to the left stroke end and supply
grease to the pin.
3) Swing the boom to the right and left several times.
(13) Boom swing cylinder rod end pin (1 place)
(14) Boom swing cylinder foot pin (1 place)
(15) Blade cylinder foot pin (1 place)
(16) Blade cylinder rod end (1 place)
(17) Blade foot pin (2 places)
3.
After greasing, wipe off any old grease that is pushed out.
MAINTENANCE
MAINTENANCE PROCEDURE
4-47
WENAM00241
Summary of Contents for PC80MR-5E0
Page 2: ......
Page 12: ...Do not repeatedly handle and lift loads VIBRATION LEVELS FOREWORD 1 10 WENAM00241...
Page 70: ...GENERAL VIEW MACHINE EQUIPMENT NAME RKA67920 GENERAL VIEW OPERATION 3 2 WENAM00241...
Page 76: ...11 Fusible link 12 Ashtray if equipped 13 Tool boxes GENERAL VIEW OPERATION 3 8 WENAM00241...
Page 343: ...SPECIFICATIONS 5 1 WENAM00241...
Page 394: ...WENAM00241...
Page 395: ...REPLACEMENT PARTS 7 1 WENAM00241...
Page 411: ......
Page 412: ......