OPERATIONS AND CHECKS BEFORE STARTING ENGINE
OPERATION
162
PW160-7H VEAM390100
2.
Lower the safety lock lever to the UNLOCK position, switch
OFF the control lever lock switch and raise the bucket from
the ground.
3.
Operate bucket control - right control lever, and arm control -
left control lever (slowly to move the bucket cylinder and arm
cylinder to the end of the stroke.
4.
Carry out bucket and arm operation for 5 minutes at full
stroke, alternating between bucket operation and arm opera-
tion at 30 second intervals.
If the swing lock switch (12) is set to the ON (actuated) posi-
tion and swing control lever is operated at full stroke, oil tem-
perature rise can be increased quicker.
NOTICE
When the work equipment is retracted, take care that it
does not interfere with the machine body or ground.
LOCK
UNLOCK
Control
lever
lock switch
B
A
D
C
(A) Arm Out
(C) Bucket Curl
(B) Arm In
(D) Bucket Dump
A
B
12
Left
control
lever
A
Left swing
B
Right swing
Summary of Contents for PW160-7H
Page 2: ......
Page 3: ...PW160 7H VEAM390100 3 FOREWORD ...
Page 12: ...LOCATIONS OF PLATES TABLE TO ENTER SERIAL NO AND DISTRIBUTOR FOREWORD 12 PW160 7H VEAM390100 ...
Page 18: ...18 PW160 7H VEAM390100 ...
Page 220: ...TROUBLESHOOTING OPERATION 220 PW160 7H VEAM390100 ...
Page 305: ...PW160 7H VEAM390100 305 SPECIFICATIONS ...
Page 307: ...SPECIFICATIONS SPECIFICATIONS PW160 7H VEAM390100 307 1 PIECE BOOM ...
Page 308: ...SPECIFICATIONS SPECIFICATIONS 308 PW160 7H VEAM390100 2 PIECE BOOM ...
Page 345: ......