MAINTENANCE EVERY 2000 OPERATING HOURS
3-46
MAINTENANCE EVERY 2000 OPERATING HOURS
This maintenance cycle includes all maintenance operations to be
performed every 100, 250, 500 and 1000 operating hours.
CHECK SHOCK ABSORBER
1.
Check the control marks A on the absorber hub (B) and the flywheel
(C). If these markings are more than 1.6 mm apart, the vibration
absorber must be exchanged.
2.
Check the rubber section. The shock absorber must be replaced
if parts are missing or if the rubber is more than 3.2 mm below the
metal surface.
3.
The shock absorber must also be exchanged if the flywheel (C)
can be moved on the absorber hub (B).
CHECKING THE COOLING SYSTEM
NOTE
Let the cooling system check be performed at a garage which is
authorised by Komatsu.
Summary of Contents for WA270-3H
Page 2: ......
Page 10: ...0 8 Contents ...
Page 11: ...INFORMATION ON THESE OPERATING INSTRUCTIONS ...
Page 12: ...0 1 0 Information on these Operating Instructions ...
Page 22: ...0 2 0 Information on these Operating Instructions ...
Page 23: ...0 2 1 Loading and Transporting the Machine LOADING AND TRANSPORTING THE MACHINE ...
Page 24: ...0 2 2 Loading and Transporting the Machine ...
Page 30: ...0 2 8 Loading and Transporting the Machine ...
Page 56: ...SAFETY LABELS 1 26 ...
Page 58: ...SAFETY LABELS 1 28 ...
Page 59: ...2 1 Operating and Control Elements OPERATING AND CONTROL ELEMENTS ...
Page 72: ...2 14 Operating and Control Elements SWITCHES ...
Page 91: ...2 33 Operation OPERATION ...
Page 123: ...2 65 Troubleshooting TROUBLESHOOTING ...
Page 137: ...3 1 MAINTENANCE ...
Page 138: ...3 2 MAINTENANCE BASICS ...
Page 152: ...3 16 LUBRICANTS AND OPERATING AGENTS ...
Page 195: ...Technical details 4 1 TECHNICAL DETAILS ...
Page 198: ...Technical details 4 4 NOTES ...
Page 199: ...Special equipment auxiliary equipment 5 1 SPECIAL EQUIPMENT AUXILIARY EQUIPMENT ...
Page 202: ...Special equipment auxiliary equipment 5 4 ...
Page 203: ... 2001 Komatsu Hanomag Aktiengesellschaft All Rights Reserved Printed in Europe 02 2001 ...