Operation
3.3 Operation
WA470-6H – VEAM946100
3-133
Digging and loading on level ground
When digging and loading on level ground, set the bucket edge
facing down slightly as follows and drive the machine forward.
Always be careful not to load the bucket on one side and cause
an unbalanced load.
This operation should be carried out in 1st gear.
CAUTION
Do not set the bucket facing down more than 20 degrees.
1. Set the edge of the bucket facing slightly down.
2. Drive the machine forward and operate the work equipment
control lever forward to cut a thin layer of the surface each
time when excavating the soil.
3. Operate the work equipment control lever slightly up and
down to reduce the resistance when driving the machine for-
ward.
When digging with the bucket, avoid imposing the digging
force onto only one side of the bucket.
GK032207
GK032208
GK032209
Summary of Contents for WA470-6 2006
Page 2: ......
Page 3: ...Foreword WA470 6H VEAM946100 1 1 1 Foreword...
Page 22: ...1 5 Contents Foreword 1 20 WA470 6H VEAM946100 7 Index 7 1 7 1 Index 7 2 8 Notes 8 1...
Page 28: ...1 7 CE Conforming equipment Foreword 1 26 WA470 6H VEAM946100...
Page 250: ...3 7 Troubleshooting Operation 3 178 WA470 6H VEAM946100...
Page 340: ...4 9 Service procedure Every 12000 hours service Maintenance 4 90 WA470 6H VEAM946100...
Page 341: ...Technical Data WA470 6H VEAM946100 5 1 5 Technical Data...
Page 343: ...Technical Data 5 1 Technical data WA470 6H VEAM946100 5 3 GK032301 A B H I G C E F D...
Page 348: ...5 4 Limit values for slopes Technical Data 5 8 WA470 6H VEAM946100...
Page 381: ...Index WA470 6H VEAM946100 7 1 7 Index...
Page 387: ...Notes WA470 6H VEAM946100 8 1 8 Notes...
Page 388: ...Notes 8 2 WA470 6H VEAM946100...
Page 389: ...Notes WA470 6H VEAM946100 8 3...
Page 390: ...Notes 8 4 WA470 6H VEAM946100...
Page 391: ...Notes WA470 6H VEAM946100 8 5...
Page 392: ...Notes 8 6 WA470 6H VEAM946100...