1.
Turn the starting switch to ON position (B).
2.
Check the DEF level gauge (1) on the machine monitor.
3.
After checking, turn the starting switch back to OFF posi-
tion (A).
4.
Set the frame lock bar to LOCK position (L).
5.
Open up the cover (2) at the right side of the machine, and
turn the cap of filler port (3) counterclockwise.
The cap of filler port is opened.
OPERATION
MACHINE OPERATIONS AND CONTROLS
3-165
Summary of Contents for WA480-8
Page 2: ......
Page 19: ...Distributor name Address Phone Fax Service personnel FOREWORD PRODUCT INFORMATION 1 17...
Page 29: ...LOCATION OF SAFETY LABELS SAFETY SAFETY LABELS 2 3...
Page 159: ...SWITCHES 1 ECSS switch 2 Front working lamp switch OPERATION EXPLANATION OF COMPONENTS 3 91...
Page 302: ...Securing position Fixing angle A 61 B 53 C 33 D 38 TRANSPORTATION OPERATION 3 234...
Page 324: ......
Page 397: ...Viewed from the rear side of the machine MAINTENANCE MAINTENANCE PROCEDURE 4 73...
Page 402: ......
Page 403: ...SPECIFICATIONS 5 1...
Page 406: ......
Page 422: ......
Page 423: ...REPLACEMENT PARTS 7 1...
Page 439: ......