3.3 Operation
Operation
3-82
WA70-7 – VENAM02003
Levelling
The purpose of levelling is to create an even surface. Use a
straight-edge bucket without teeth. Levelling includes two steps:
filling in and drawing off.
Filling in
It is possible that holes in the ground in front of the machine
need to be filled with soil. Proceed as follows:
NOTICE
For filling, tilt the bucket by a maximum of 15°.
Scoop soil into the bucket. Drive the machine slowly forward
while spreading soil from the bucket little by little. If there are
particularly large holes to be filled in, also place some soil in
front of the bucket to be spread while driving forwards.
Dragging
After filling in the holes, you may level the ground.
ATTENTION
Danger of accidents! Carelessly driving in reverse may
cause severe accidents!
Check that there are no persons behind the machine before
starting to drive in reverse. Use the horn to warn persons
who are in your way.
Slightly angle the bucket downwards. Drive in reverse while
dragging the bucket over the ground.
To make the ground particularly level, lower the boom in the
floating position. Slowly drive in reverse while dragging the
smooth underside of the bucket over the ground.
Scraping
Scraping is a special form of levelling. It is used to remove the
topmost soil layer.
Always drive in the lower speed range when scraping.
NOTICE
Scraping with the bucket in the dumping position damages the
bucket and the teeth. Align the bottom of the bucket level with
the ground when scraping.
Summary of Contents for WA70-7
Page 2: ......
Page 3: ...Foreword WA70 7 VENAM02003 1 1 1 Foreword...
Page 23: ...Foreword 1 5 Table of contents WA70 7 VENAM02003 1 21 Blank for technical reason...
Page 28: ...1 7 Equipment Foreword 1 26 WA70 7 VENAM02003...
Page 75: ...Operation WA70 7 VENAM02003 3 1 3 Operation...
Page 114: ...3 2 Descriptions of the individual elements Operation 3 40 WA70 7 VENAM02003 Fuse allocation...
Page 185: ...Troubleshooting WA70 7 VENAM02003 4 1 4 Troubleshooting...
Page 203: ...Maintenance WA70 7 VENAM02003 5 1 5 Maintenance...
Page 277: ...Technical data WA70 7 VENAM02003 6 1 6 Technical data...
Page 283: ...Special equipment attachments WA70 7 VENAM02003 7 1 7 Special equipment attachments...
Page 291: ...Index WA70 7 VENAM02003 8 1 8 Index...
Page 296: ...8 1 Index Index 8 6 WA70 7 VENAM02003...
Page 297: ...Notes WA70 7 VENAM02003 9 1 9 Notes...
Page 298: ...Notes 9 2 WA70 7 VENAM02003...
Page 299: ...Notes WA70 7 VENAM02003 9 3...
Page 300: ...Notes 9 4 WA70 7 VENAM02003...
Page 301: ...Notes WA70 7 VENAM02003 9 5...
Page 302: ...Notes 9 6 WA70 7 VENAM02003...