Operation
3.3 Operation
WA70-7 – VENAM02003
3-75
3.3.8
Operating the work equipment
Multi-function lever
The multi-function lever controls the work equipment. The multi-
function lever has 6 positions to control the work equipment as
follows:
SW
Floating position
â
The multi-function lever locks in this position. The floating position
is used for levelling (drawing off).
In this switching position, the work equipment lowers under its
own weight and moves freely due to external force.
S
Lower
ç
This switch position lowers the boom. When the engine is not run-
ning, you can lower the work unit by setting the multi-function
lever to this position (in emergencies).
0
Hold
å
The boom is held in position.
H
Lift
ã
The boom is raised.
E
Tilt
ä
This position causes the bucket to tilt.
A
Dump
à
This position causes the bucket to dump.
Summary of Contents for WA70-7
Page 2: ......
Page 3: ...Foreword WA70 7 VENAM02003 1 1 1 Foreword...
Page 23: ...Foreword 1 5 Table of contents WA70 7 VENAM02003 1 21 Blank for technical reason...
Page 28: ...1 7 Equipment Foreword 1 26 WA70 7 VENAM02003...
Page 75: ...Operation WA70 7 VENAM02003 3 1 3 Operation...
Page 114: ...3 2 Descriptions of the individual elements Operation 3 40 WA70 7 VENAM02003 Fuse allocation...
Page 185: ...Troubleshooting WA70 7 VENAM02003 4 1 4 Troubleshooting...
Page 203: ...Maintenance WA70 7 VENAM02003 5 1 5 Maintenance...
Page 277: ...Technical data WA70 7 VENAM02003 6 1 6 Technical data...
Page 283: ...Special equipment attachments WA70 7 VENAM02003 7 1 7 Special equipment attachments...
Page 291: ...Index WA70 7 VENAM02003 8 1 8 Index...
Page 296: ...8 1 Index Index 8 6 WA70 7 VENAM02003...
Page 297: ...Notes WA70 7 VENAM02003 9 1 9 Notes...
Page 298: ...Notes 9 2 WA70 7 VENAM02003...
Page 299: ...Notes WA70 7 VENAM02003 9 3...
Page 300: ...Notes 9 4 WA70 7 VENAM02003...
Page 301: ...Notes WA70 7 VENAM02003 9 5...
Page 302: ...Notes 9 6 WA70 7 VENAM02003...