OPERATION
OPERATION
3-127
5.
Disconnect the lift arm and bucket.
INSTALLING THE BUCKET
3
Before installing the bucket, remove all grease, mud, or sand and clean the pin, pin hole, and area around the
boss. (If there is any rust or dirt on the inside surface of the pin hole, use sandpaper and remove it carefully.)
After cleaning, coat the pin and inside surface of the pin hole with fresh grease.
1.
Set cord ring (2) on top of lift arm boss (1) as shown in the
diagram.
After completing assembly of the bucket and adjustment
with shims in step 8, move the cord ring down to the
groove.
2.
Coat dust seal lip portion (3) with grease.
3.
Align the left and right bucket pin holes.
4.
Select the number of shims so that clearance A between
bucket hinge boss (4) and lift arm boss (1) are less than
1.0 to 1.5 mm.
Bucket
Bucket link
Lift arm
Summary of Contents for WA800-3E0
Page 2: ......
Page 3: ...FOREWORD 11...
Page 27: ...SAFETY SAFETY LABELS 2 5 LOCATION OF SAFETY LABELS 2...
Page 66: ...GENERAL VIEW OPERATION 3 4...
Page 84: ...EXPLANATION OF COMPONENTS OPERATION 3 22 SWITCHES 3...
Page 224: ...TROUBLESHOOTING OPERATION 3 162...
Page 309: ...SPECIFICATIONS 15...
Page 330: ...HANDLING MACHINES EQUIPPED WITH VHMS ATTACHMENTS OPTIONS 6 20...
Page 331: ...INDEX 17...
Page 332: ...INDEX 7 2...
Page 335: ...COLOPHON 18...