UAB AMALVA we reserve the right to make changes without prior notice.
33
1. Air handling unit
2. Air duct connections
3. Sound attenuator
4. Rubber mat (not included in unit set)
Minimum Maintenance Space for Horizontal Units
Minimum Maintenance Space for Vertical Units
100 mm
min. 700 mm
3.1.1 a Picture
100 mm
min. 700 mm
3.1.1 b Picture
REGO unit Installation Scheme
2
3
1
2
4
2
1
3
REGO 1200P
4 5
1
2
3
ceiling
6
3.1.2 Picture
Unit holder is made of 2,5 mm galvanized steel sheets according to EN 10142.
Condensate Drain Connections
All condensate drain connections must be correctly trapped. Incorrect trapping can result in flooding within the unit
and consequent flooding of the immediate area. Fill the drain trap with water before starting up the unit.
All drain lines should be insulated where passing through any space where damage from condensation drip
might occur. If the unit is installed in unheated premises the condensate pipe should be heat-insulated and heated
with heating cable.
1. Air handling unit
2. Ducts connection
3. Sound attenuator
4. Rubber mat (not included in unit set)
5. Holder
6. Ceiling holder (included in unit set)